Hot Sale Cg125 Motorcycle Suspension Manufacturer China Supplier Front Shock Absorber for OEM Left Right Spare Parts Factory Price

Still deciding? Get samples of $ !
Order Sample

Product Description

i

Basic Information

Model NO.
QDC006
Structure
Telescopic-tube Front Fork Hydraulic Shock Absorber
Certification
ISO9001
Load Adjusting Method
Spring Initial Pressure Regulating Type
Hydrocylinder Position
Regular Type
Damping Force
One Way Direction
Applicable Motorcycle
Honda
Cylinder Diameter
27mm
Brand
Qdc
Origin
China
Production Capacity
40,000 sets/Month
HS Code
8714190090
📦

Packaging & Delivery

Package Size
40.00cm * 29.00cm * 15.00cm
Gross Weight
12.000kg
Transport Package
Bubble Bag, Pearl Cotton, Carton
⚙️

Product Description

We have an annual production capacity of 800,000 sets of shock absorbers, 4 million fork pipes, and 800,000 sets of aluminum bottom cases. Order lead time typically ranges from 15 to 30 days. We also offer professional product design and development services tailored to specific customer requirements.
Motorcycle Front Shock Absorber
Detail View 1 Detail View 2 Detail View 3
Technical Drawing Product Specifications
Production Process 1 Production Process 2 Production Process 3 Quality Control 1 Quality Control 2 Quality Control 3
?

Frequently Asked Questions

1. Are you a direct manufacturer or a trading company?
We are a manufacturer with an integrated trading company, allowing us to provide a wider range of products and comprehensive services.
2. How long does it take to receive a response to an inquiry?
We typically reply within 12 hours after receiving your inquiry. We are also available on various instant messaging tools for real-time communication.
3. Can you provide customized products?
Yes, we specialize in developing and producing customized products based on the drawings or samples provided by our customers.
4. What are the standard payment methods?
Commonly, we require a 30% advance payment with the balance due upon the bill of lading. We accept T/T and L/C. Trading terms such as FOB, CIF, and CNF are available.
5. What is the typical delivery time for orders?
For items in stock, delivery takes 1 to 7 days. For items that need to be manufactured based on your order, the lead time is approximately 15 to 30 days.
6. How do you guarantee product quality?
We implement strict inspections during production and conduct a final check before shipment to ensure all products and packaging meet our high standards.

Related Products